Page 1 of 1
CONSTRUCTION SCHEDULE

TECHNICIAN:
Vasiliy Smal

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tuesday, October 15, 2019

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10am 4900-001.00
Hyatt House Hotel Davis

Concrete Reinforcement

Address:
2750 Cowell Boulevard

Notes:

Special Instructions:
gate # 4645, gate closest to the job trailer

Directions:
Get on I-80 W from Industrial Blvd 4 min (2.0 mi)

Follow I-80 W to Mace Blvd in Davis. Take exit 75 from I-80 W 6 min (6.5 mi)

Take Chiles Rd to Cowell Blvd

Requested By: mike 916-531-4645

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Client:
2750 Cowell LLC

Attention: Guneet Bajwa

c/o Presidio Companies

1007 7th Street, Suite M-100

Sacramento, CA 95814

Sampled By / Date
SAMPLE DESCRIPTION
SUPPLIER
DD
M%

Pat Lucarelli 8/28/2019
CL, Silty Clay, Gray O.G., 0-12" down B 111.4
15

Pat Lucarelli 8/28/2019
CL, Silty Clay, Gray O.G., 12"-24" down B 115.1
14.8

Pat Lucarelli 9/4/2019
CL, Silty Clay w/Lime, Gray B 109
17.2

Karen Farfan 9/27/2019
AB, 3/4" Recycled Utility trench C 134
7.5

Vasiliy Smal 9/10/2019
AB, 3/4" Class 2, Virgin Rock C 140.5
7

======================================================================
7am 146-510.02
Mace R & D Structural Davis

EWK - Chem Treat Pavement Subgrade

Concrete Sample P/U

Address:
Mace Blvd and Alhambra Drive

Notes:
2nd day chem all day get lime cement curve

Special Instructions:
Earthwork Job is 146-510.01

Directions:
Get on I-80 W from Industrial Blvd 4 min (2.0 mi)

Follow I-80 W to Mace Blvd in Davis. Take exit 75 from I-80 W 6 min (6.5 mi)

Take E Covell Blvd to Mace Blvd7

Requested By: john 916-997-4835

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Client:
Buzz Oates Construction

Attention: Dennis Chilton

555 Capitol Mall

Ninth Floor

Sacramento, CA 95814

======================================================================

Uploaded on:
Monday, October 14, 2019 3:39 PM