CONSTRUCTION SCHEDULE

TECHNICIAN:
Tasia Sutfin

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tuesday, October 15, 2019

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2am 146-634.00
North Watney Way Warehouse Fairfield

Concrete - Floor Slab

Address:
North Watney Way

Notes:
650 yards slab

Special Instructions:

Directions:
Get on I-80 W from Industrial Blvd 4 min (2.0 mi)

Follow I-80 W to Chadbourne Rd in Solano County. Take exit 43 from I-80 W

33 min (37.7 mi)

Continue on Chadbourne Rd. Drive to N Watney Way in Fairfield

East of Jelly Belly Factory

Requested By: Simon 916.997.1671

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Client:
Buzz Oates Construction

Attention: Simon Preciado

555 Capitol Mall

Ninth Floor

Sacramento, CA 95814

Sampled By / Date
SAMPLE DESCRIPTION
SUPPLIER
DD
M%

Vasiliy Smal 8/29/2019
CL, Sandy Clay, Mottled Gray-Brown Native B 121
11.5

Vasiliy Smal 9/3/2019
CL, Sandy Clay with minor Gravel B 123.5
11.9

Karen Farfan 9/12/2019
CL, Sandy Clay with Lime, 4.5% Cement, Gray B 116
12.8

Karen Farfan 9/13/2019
CL, Sandy Clay with Lime, Cement, Gray Sample A B 114.4
14.4

Karen Farfan 9/13/2019
CL, Slty Clay with Lime, Cement, Gray Sample B B 103.6
19.8

Vasiliy Smal 9/24/2019
AB, 3/4" Class 2 C 137.3
7.7

Vasiliy Smal 9/30/2019
AB, 3/4" Class 2 Sewer Trench C 141.1
6.8

Vasiliy Smal 10/4/2019
AB, 3/4" Recycled with Brick, AC C 128.5
9

======================================================================