Page 1 of 1
CONSTRUCTION SCHEDULE

TECHNICIAN:
Pat Lucarelli

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Tuesday, October 15, 2019

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
730am 2716-005.01
Sandstone Medical Office Building El Dorado Hills

EWK - Utility Trench

Address:
Golden Foothill Parkway and Sandstone Drive

Notes:
Storm drain back fill full time

Special Instructions:
Gate code# 3459

Directions:
Get on I-80BL E/US-50 E from Beacon Blvd 2 min (0.6 mi)

Follow US-50 E to Latrobe Rd in El Dorado Hills. Take exit 30A from US-50 E

26 min (28.3 mi)

Drive to Golden Foothill Pkwy

Requested By: robert 916-666-3459

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Client:
GP Development

Attention: Steve Schiber

10604 Industrial Avenue, Suite 150

Roseville, CA 95678

Sampled By / Date
SAMPLE DESCRIPTION
SUPPLIER
DD
M%

Vasiliy Smal 6/4/2019
CL, Sandy Clay, Light Reddish Brown B 118
14

Shannon Williams 6/13/2019
GC, Clayey Gravel, Orange-Brown Import C 144.5
6.5

Karen Farfan 9/9/2019
AB, 3/4" Class 2, Virgin Rock C 141
7.3

======================================================================

Uploaded on:
Monday, October 14, 2019 3:39 PM